1. In1995, we processed and
produced pipefittings and fasteners for the first period extension project
of Huabei Refinery. Most of these were large flanges,
the biggest outer diameter of which is 2.65 M, inner diameter
2.2 M. height 0.3 M. weight 5.8 tons. It is a Grade 2 whole
forge piece. which is of great
technique difficulty. The technical
personnel made great efforts in fulfilling this
task and finished making these fittings and fasteners ahead of
schedule.
2. In1996-97,
adopting ANSIB16.5standard, we produced fittings for the Boxi project, Mobil
project QK17-2,SZ36-1,QHD32-6 of Ocean Petroleum Engineering
Project Co. Ltd.
3. In1997,
we successfully produced quality pipe-fittings (flanges) for the ethene-container
area`s mending project of Beijing Orient Company.
4. In1998,
we successfully manufactured pipefittings for the 660,000ton Ethene
Extension project and Hydrogen-project and
hydrogen-producing project of beijing yanshan petrochem General Co,
5. In1999,
we produced all the needed stainless flanges,
revers and other fittings for the
200,000-ton Ethene Extension project
of Tianjin Petrochem General Co.
6.
In1998-99,we participated in the project of Huhehaot Refinery Plant, Xinjiang
Tuha Oilfield Construction project ,and the construction project of Jidong
Oilfield.
7. In2000,we
manufactured all the needed fittings for the hydrogen-filling reforming
project of Xinjiang Tuha Oilfield ; all the
pipefittings for Hashimu Refinery of Sudan.
8. In2001,
we won the high praise of Beijing Natural Gas Co.
for the good job we did in producing all the flanges and
fasteners for the project of Carrying the West Gas to the East.
|